Projects

FREE TO USE PICS. 22/6/2023. Transport, Planning & Engineering (TP&E), at their site near Penpont, Dumfriesshire.

From inception to construction we are focused on creating opportunities for people to walk, cycle and wheel through delivering high quality infrastructure projects.

Working with local authorities, public bodies and community organisations we've been involved in varied projects across Scotland.

Find out more about our impact in 2020-21 in the Cycling Scotland annual report (section 7, p. 30-31).

Case studies

1. Bears Way Protected Cycle Route

Phased design and supervision of construction of a protected cycle route resulting in improved pedestrian and public transport infrastructure on a major arterial road.

Read case study

2. Loch Earn Railway Path

Long distance route development along the no longer used railway line from Comrie to Lochearnhead.

Read case study

3. Little France Park Active Travel Route

Design and supervision of construction of peri-urban, all-abilities, active travel path in Edinburgh.

Read case study

4. Provost’s Walk Path Network Upgrade

Design and supervision of construction of peri-urban all-abilities active travel path in Auchterarder.

Read case study

5. Scottish Canals Access Study

Feasibility and outline design of access improvements along the Lowland Canals.

Read case study

6. Dumfries and Galloway Active Travel Street Audits

Street audits of towns and villages across Dumfries and Galloway.

Read case study

Project locations

 

Get in touch